The property consists of a steel frame truss constructed workshop and double storey building used as reception and offices.
The workshop has full height brick infill sitting under a pitched roof covered in insulated profile sheet cladding incorporating intermittent translucent panels which allows natural daylight into the workshop. Staff amenities are located at the rear of the unit along with a mezzanine which provides additional storage.
Externally the property has been overclad with horizontal cladding panels providing a modern look. Height under the steel frame truss is 3.97m. A 1.5 tonne crane was in situ in the workshop and a single access shutter measured 3.26m (w) x 3.82m (h).
The property occupies a prominent position on Madeley Street and benefits from high levels of passing traffic from the Daltry Street flyover.