The premises comprises an industrial unit and constructed around a steel portal frame with full height block work infill in part, and part block work infill with upper level cladding. The roof was pitched and covered in what appeared to be a single skin asbestos sheet cladding, underdrawn internally with insulation. With intermittent translucent panels throughout natural daylight into the premises, along with LED lighting.
The ground floor benefits from office / reception, with staff WC facilities.
The property is accessed by an insulated up and over shutter measuring 4.55m wide x 5.09m high, with internal eaves heights of 6.08m rising to 7.40m at the apex.